Is the Lego rough terrain crane worth it?

Is the Lego rough terrain crane worth it?

The new 42082 Rough Terrain Crane beats all of them in terms of both size and piece count. And judging by its functions and a very solid choice of pieces it offers, the set easily lands at the top of the list of the most attractive LEGO Technic sets of recent years.

How much does a Lego crane cost?

For Sale (New/Sealed)

(DE) LEGO 42082 TECHNIC – Rough Terrain Crane – DAMAGE BOX – NEW / FACTORY SEALED $320.00 -20.0%
(US) 42082 Technic Rough Terrain Crane Building Kit 4057 Pieces NEW & SEALED $415.99 +4.0%
(US) Technic Rough Terrain Crane 42082 New Sealed Box 4056 Pcs Fast Shipping $417.50 +4.4%

What is the tallest Lego Technic set?

Lego Technic Liebherr R 9800 Excavator
Biggest Lego sets: Lego Technic Liebherr R 9800 Excavator This is the largest Lego Technic set currently available, built from over 4,100 pieces, and the end result is 65cm (25 inches) long, 27cm (10 inches) wide and 36cm (15 inches) tall.

Is there a Lego Technic rough terrain crane 42082?

The LEGO Technic Rough Terrain Crane 42082 can be built together with all other original LEGO Technic building sets and LEGO building bricks for creative construction

How tall is the tallest Lego Technic Crane?

Amazon Business: Make the most of your Amazon Business account with exclusive tools and savings. Login now Enjoy an immense build and play experience with the LEGO Technic 42082 Rough Terrain Crane, our largest and tallest LEGO Technic rough terrain crane to date, pre-August 2018.

What kind of vehicle is a rough terrain crane?

The concept of the rough terrain crane is quite simple. This vehicle is a rather compact 4- or 6-wheel mobile crane with a telescopic boom suitable for work in stiff terrain, where jobsite flexibility is valued.

How long does it take to build a rough terrain crane?

The instructions are split into two books and the parts are sorted into 13 sections. Finding parts this way is not too daunting. Total build time for me was about twenty hours split over three days. The crane lifts more than I thought it would and the spindle winds and unwinds the cable extremely well.