How do I create an update statement in SSIS?

How do I create an update statement in SSIS?

  1. Drag and drop OLE DB Source onto the Package.
  2. Right click on the OLE DB Source and then select edit.
  3. Set properties as shown following:
  4. Click Ok.
  5. Drag and drop Conditional Split component onto the package.
  6. Connect it to OLE DB Source and then right click on it and then select edit.

What can you do in a SSIS task?

SSIS Tasks

  1. Execute SQL Task. It is used to execute the SQL statements against a relational database.
  2. Data Flow Task.
  3. Analysis Services Processing Task.
  4. Execute Package Task.
  5. Execute Process Task.
  6. File System Task.
  7. FTP Tasks.
  8. Script Task.

What is script task in SSIS with example?

The Script task provides code to perform functions that are not available in the built-in tasks and transformations that SQL Server Integration Services provides. You use the Script task for work that must be done once in a package (or once per enumerated object), instead than once per data row.

How is the maintenance plan based on SSIs?

The second task (the dependent task) executes only if the execution result of the first task (the precedent task) matches specified criteria. Typically the execution result specified is Success, Failure, or Completion. The maintenance plan designer surface is based on the SSIS designer surface. For more information, see Precedence Constraints.

How to create a subplan in SQL Server?

Add a subplan that you can configure. Display the Subplan Properties dialog box. Select a subplan in the grid and click this icon to enter a name, description, and schedule for the subplan. You can also double-click the subplan in the grid to display the Subplan Properties dialog box.

Where to find maintenance plan tasks in SQL Server?

If the Maintenance Plan Tasks toolbox is not visible, choose Toolbox from the SQL Server Management Studio View menu. Expand the Maintenance Plan Tasks node in the Toolbox pane.

How to add a subplan to the design space?

To add another subplan that contains tasks run on a different schedule, click Add Subplan on the toolbar to open the Subplan Properties dialog box. In the design space’s toolbar, click Manage Connections. In the Manage Connections dialog box, click Add.